Create a project
A project is the workspace for one piece of work. It holds the files, records, runs, and people for that work in one place. This page covers creating a project, choosing who can access it, and opening or closing it. For a tour of a project’s tabs once it exists, see Projects overview.
You need permission to create projects. If you don’t have it, the New project page shows a banner: “You don’t have access to create projects. Ask an admin if you need it.” See Roles and permissions.
Start a new project
Creating a project is a two-step flow: first you choose a starting point, then you fill in the details.
Open the new project flow
Click New project at the top of the Projects list, or use the New project entry in the Projects group in the sidebar. You land on the New project page.
Choose a starting point
Pick one of the cards:
- Blank project — “Just a name, an icon, and the people who can see it.” Set everything up yourself.
- A project template — a ready-made setup. Each template card shows its icon, name, an optional description, and a hint like “Projects get numbers like IMM-1.” Choosing a template pre-fills the icon and the access list for you.

Templates are built and maintained separately. This page only consumes one — to create or edit templates, see Project templates.
Fill in the details
A header label shows what you picked: Blank project or From “{template name}”. Fill in the Details section:
- Project name (required) — for example, Acme Corp or Pre-screening review.
- Project number (read-only) — assigned automatically. Blank projects use the shared
PRJprefix (likePRJ-1); template-based projects inherit the template’s prefix (likeIMM-1). You can’t choose or change the prefix. - Icon — opens a picker. Search and pick one.
- Description (optional) — “Optional notes for anyone working on this project.”

Set who has access
In the Access section, choose who can see and edit this project. See Set who can access a project below for the rules.
The project number is fixed once the project is created — neither the prefix nor the number can be changed later.
Set who can access a project
Access is controlled by two pickers, both when you create a project and later in the Settings tab:
- Roles with access — pick one or more roles. Everyone with a listed role can see and edit the project.
- People with access — pick individual people by name.
A person can open a project if any of these is true:
- They’re an admin — admins always have access.
- They created the project — you always have access to projects you create.
- They’re listed individually under People with access.
- One of their roles is listed under Roles with access.
A blank project starts private: “Only you will see this project until you add people or roles.” A project created from a template comes with the template’s default access pre-filled — you can change it now or later.
Roles are assigned in your identity provider, not in RakerOne. To understand what each role can do, see Roles and permissions. To find the people in your organization, see Members and invites.
Open and close a project
Every project is either Open (green badge) or Closed (grey badge). Closing a project doesn’t delete it — it stops new work and makes existing work read-only, while keeping everything visible to people with access.
Close a project
Reopen a project
Open the project, then either:
- Use the ”…” menu in the project header and choose Close project, or
- Go to the Settings tab and use the Close this project card.
Closing a project: “Runs stop and work becomes read-only. You can reopen it later.” A closed project drops out of the active project list, and its start and run buttons are hidden.
If a project still has runs in flight when you close it, those runs may keep going. A banner appears at the top of the project: “This project is closed, but N run(s) is/are still active. Reopen the project to act on them, or let them finish on their own.”
Closing and reopening require the close-project permission. If you don’t have it, the Close project / Reopen project options don’t appear. See Roles and permissions.
The Settings tab
The Settings tab is where you update a project’s details, change its access, and close it. Its subtitle reads: “Update this project’s details and control who can access it.” Editing requires the manage permission — without it, you see the same information read-only. Click Save to apply changes.

Project details
The name and description shown to everyone with access. Fields:
- Name (required)
- Icon (icon picker)
- Description
Access
The same two pickers used at creation — Roles with access and People with access. If you can’t edit, you see read-only lists, with No roles or No people when empty.
Close this project
Appears only when the project is Open and you can close it. Closing stops runs and makes work read-only; you can reopen later.
Summary
A reference panel showing Status, Number, Created from (A template or Started blank), the date Created, and the date Updated.
Created from a template
If the project was created from a template, a banner reads: “Created from a template — the setup stages are fixed, but you can still change the name, icon, description, and who has access.” The copied setup can’t be edited here.
Where to go next
Get to know the project workspace and all of its tabs.
Build reusable templates so teams start projects the same way every time.
See what each role can do across the organization.
See who’s in your organization and how people are added.